Server Room Partition Walls

Feel secure with the right choice of
Modular De-mountable Partiton System

  • No Downtime
    Because the system is clean and pre-finished it can be installed or moved with NO fuss or bother and without shutting down your servers. Saving YOU money and increasing YOUR profitability.

  • Better Cooling
    Generous perforation ensures better temperature stability and balance throughout your whole facility keeping your valuable equipment cooler.

  • Fire Protection
    Un-interrupted airflow means there’s no need to spend money on expensive modifications to your fire detection /protection system.

  • Massive Savings - Real Value
  • No mess.
  • No builders.
  • No plastering.
  • No painting.
  • No dust.
  • No skips.
  • No downtime.
  • De-mount
  • Re-use
  • Recycle
  • Remodel
  • Reinvent
  • Re-style
  • Re-do


  • Security
    All doors are pre-punched to accept the most popular access control equipment saving you money
    on installation costs. Door frames accept the most
    popular exit signs.

  • Flexibility

    • Modular design gives you long term flexibility.
    • Doors and wall modules can be interchanged at will

    • You can add,subtract or modify the system to
      cope with your ever changing needs

    • Doors can open in or out, to left or right.

    • Cables can be dropped in at every pillar

    • Single and double door systems are standard

    • Doors are designed to cope with the standard server cabinet

Switch-Flo Partition Systems

Switch-Flo Partition Systems

Partition wall

How the Server Room Partition works.

Step 1
Fit the Ceiling and floor rails.
The ceiling rail is fixed using screws which are driven into
grounds fitted on the up side of the ceiling tiles. Pre punched
holes are supplied in the rails for the purpose.
Using a plumb line the floor rails are positioned vertically underneath the ceiling rail. The floor rails are fixed using screws driven into the floor tiles. Pre punched holes are supplied in the rails forthe purpose. There are no rails at the door positions

 

Switch-flo

Step 2
Insert the wall and door modules where required.
The wall and door modules are inserted into the top rail at a slight angle and lifted high enough so as to clear the floor rail. They are then dropped over the floor rail thereby hiding it and securing the module from lateral movement

 

Switch-flo

Step 3
Secure all the modules.
Use the special M8 tie rods to join the modules to each other. There are 3 in each pillar. Use the special countersunk version to secure the door frames where required.

 

Switch-flo

Step 4
Fit the access control equipment.
Fit the access control equipment to the pre punched openings in the doors. Space is provided in the door frame headers to accommodate the control units.

 

Switch-flo


Switch-flo Specification